Project
DH200F,100kW/215kWh
-
Address
Spain
-
Date
July 2024
-
Application
Emergency Power + PV Consumption
Project Background
The island suffers from unstable power grids and has been using oil rigs as a back-up power source.
Project Introduction
Overall scale of the project: rooftop distributed photovoltaic: 100kWp, energy storage system construction capacity: 100kW/215kWh, peak load power: 70kW
Construction of photovoltaic storage integration system.
Adopting energy management system (EMS) for coordinated control and energy optimization management of photovoltaic storage equipment, EMS monitors grid power, PV power and energy storage power to achieve automated operation, escorting users' daily use and increasing users' income.
Technological Breakthrough
For planned PV projects, Dyness adopts DH200F (integrated PV and storage product), which reduces the difficulty of overall project design, eliminates the need for external grid-connected inverter, provides PV efficiency and reduces the construction cost. Moreover, DH200F has the function of emergency power supply, which can be switched on and off-grid with a switching time of less than 20ms, and provides stable and reliable power support for the user's loads. With the remote web & APP platform, users can monitor the status of the power plant in real time, which is safe and convenient while bringing revenue.
Project Benefits
Dynamic capacity increase to supplement power during peak hours to support normal load operation;
Enhance the local consumption rate of PV, helping to reduce carbon and increase PV power generation revenue.