Overall project scale: roof distributed PV: 350kWp, energy storage system construction capacity is: 300kW/645kWh, peak load power: 350kWPhotovoltaic + energy storage + charging pile, AC coupling, to solve the difficult point of uncoordinated work between photovoltaic, storage and charging equipment.
Adopting energy management system EMS for coordinated control and energy optimization management of photovoltaic-storage equipment, EMS monitors the power grid power, photovoltaic power, and energy storage power to realize automated operation, escorting the daily use of the users and increasing the user's income.