-
Project
Tower Pro, 23.04 kWh
-
Address
Netherlands
-
Date
August 2025
-
Application
PV+AC
Background
In the suburbs of Amsterdam, the family of three faced growing electricity demands, especially during the long, cloudy winters when solar generation is limited and the grid can be under pressure. They wanted a solution that would maintain a comfortable lifestyle while reducing reliance on the public grid and increasing energy independence.
Introduction
The family chose the Dyness Tower Pro Series for their home, paired with a high-voltage residential solar setup, creating a flexible and efficient energy storage system. Tower Pro supports up to 12 clusters in parallel, covering 7.68 kWh to 276.48 kWh, easily meeting diverse household electricity needs.

With its modular, stackable design, Tower Pro requires no internal wiring, and a single person can complete installation in just 15 minutes. The auto-configuring modules simplify setup and ongoing maintenance, while high-voltage output maximizes energy efficiency and ensures reliable power delivery for all household appliances.
Customer Value
The family can store solar energy during the day and use it efficiently at night, powering lighting, heating, and appliances without interruptions. The system provides long-term reliability, operational simplicity, and greater flexibility, enabling the family to enjoy a comfortable and energy-independent home.
Typical Case
Contact Us
-
Buy Products
-
Become a Partner
-
After-sales
-
1.Background
-
2.Introduction
-
3.Customer Value
-
4. Typical Case
-
5. Related Products
-
6. Product Inquiry